• Himachal Pradesh CM recently directed officials to make the 100 MW UhlIII hydropower project functional by May next year.

About Uhl–III hydropower project

  • It is located at the Rana Neri Khad River in the Mandi district of Himachal Pradesh.
  • The Project comprises the diversion of tail water of Uhl Stage-II (Bassi), Neri Khad & Rana Khad.
  • Installed capacity: 99.99 MW.
  • The power plant is owned and operated by Beas Valley Power Corporation Limited.
Print Friendly, PDF & Email

© 2023 Civilstap Himachal Design & Development