November 3, 2025

Current Context : Prime Minister Narendra Modi recently laid the foundation stone for the Ken-Betwa River Linking Project and inaugurated Madhya Pradesh’s first floating solar power plant.

Ken-Betwa River Linking Project

  • Objective: Transfers surplus water from the Ken River to the Betwa River to address water scarcity in Bundelkhand (Madhya Pradesh and Uttar Pradesh).
  • Irrigation and Water Supply: Provides irrigation to 1.08 million hectares and drinking water to 6.2 million people.
  • Hydropower: Generates 103 MW of hydropower.

Madhya Pradesh Floating Solar Power Plant

  • Location: Omkareshwar Dam reservoir in Khandwa district.

Capacity: Planned 600 MW, with the first phase generating 90 MW.

Print Friendly, PDF & Email

© 2025 Civilstap Himachal Design & Development