October 14, 2025

CE20 engine

  • ISRO successfully completed the CE20 E13 engine hot test for the Gaganyaan qualification and 22-tonne thrust qualification.
LVM3 is configured as a three stage vehicle with two solid strap-on motors (S200), one liquid core stage (L110) and a high thrust cryogenic upper stage (C25).
  • The engine developed by the Liquid Propulsion Systems Centre (LPSC), Valiamala was tested at ISRO Propulsion Complex (IPRC), Mahendragiri, Tamil Nadu.
  • The CE20 engine is a vital component, serving as the powerhouse of the Cryogenic Upper Stage (CUS) responsible for propelling the upper stage (C25) of the Launch Vehicle Mark-3 or LVM3 vehicle.
  • It has demonstrated its capability by successfully operating at a thrust level of 19 tonnes in six successive LVM3 missions, including the Chandrayaan-2, Chandrayaan-3, and two commercial OneWeb missions.
  • The CE20 engine hardware referred to as E13 was selected for both Gaganyaan qualification and 22-tonne thrust level operations.
Print Friendly, PDF & Email

© 2025 Civilstap Himachal Design & Development