WHY IN NEWS? The Army inducted the first production lot of 12 Short Span Bridging System (SSBS)-10m, designed and developed by the Defence Research and Development Organisation (DRDO) in association with Larsen & Toubro Limited, the production agency. The SSBS-10m plays a crucial role of bridging the gaps up to 9.5m as a single span providing a 4m wide, fully decked roadway, ensuring faster movement of the troops. The project involved the development of two prototypes of 5m SSBS on Tatra 6×6 chassis and another two prototypes of 10m SSBS on Tatra 8×8 re-engineered chassis. This bridging system is compatible with the Sarvatra bridging system (75....Read More
© 2025 Civilstap Himachal Design & Development